![]() Limit for most email servers)ģ) Same as 3 above but email Interac transferĤ) Reply to comments from the plan examiner sent by email. Simple and pretty much the same everywhere.Ģ) Same as 2 above except one PDF file (PDF must not exceed 5meg. The Province of Ontaria adopted a standard method for submission of paper documents.ġ) Fill out the mandated building permit form (mandated by the Ontario Building Code Act) that all municipalities had to accept.Ģ) Provide at least 2 copies of the drawings in whatever scale is shown on the drawing. So far as I can tell, no two municipalities have adopted the same submission standards, and so submission has become a major task up from a simple formality. That is to say, each municipality is reinventing the wheel. In digital format, various municipalities are setting up criteria for acceptable submission standards that are divergent. My projects are increasingly moving into the digital submission world.
0 Comments
Leave a Reply. |